2012 Budget Adjustments & Health Insurance Savings

The City of Monona saved about $286,994 in 2012 premiums by switching health insurance providers. The city council has been struggling with how to use this savings. At our February 6 meeting, I proposed and the council approved a budget amendment to reduce borrowing for Monona drive Phase II construction by $143,800.

At the February 6 meeting, on a 3-3 vote the council rejected a proposal by alders Speight and Munson to use $75,000 for non-represented employee compensation after a contentious debate (alder Speight lobbed a 'corporatist' grenade and alder Busse responded with a J. Paul Getty reference!). Their amendment included $40,000 for merit raises and $35,000 to reimburse those employees for part of the new 5.9% retirement contributions. Budget amendments require a 2/3 majority, so Mayor Miller could not cast a tie-breaking vote. I don't think anybody was happy with that outcome.

Shortly thereafter, unbeknownst to one another, alder Busse and I began working on a possible compromise on employee compensation as well as the remaining health insurance savings. We learned about our separate efforts when we each contacted city administrator Pat Marsh. Jim and I sat down over coffee and worked out a compromise that we each could live with. Whether we could carry the rest of the council with use was an open question.

We had two goals in mind: 1) Reduce city borrowing in 2012 (the 2012 capital budget is significantly higher than it has been in the recent past and is projected for in the future) and 2) Increase non-represented employee compensation.

Last night, at our February 16 meeting, the council adopted 3 of our 4 proposed amendments and referred the fourth to the CDA.

  1. $56,000 for merit pay raises for non-represented, permanent employees not under contract (the city administrator and Public Works Director) in amounts as determined by the city administrator and $5,000 in spot merit bonuses for which the contracted employees would eligible. Passed 5-1 with alder Wiswell opposing.
  2. $3631 to equip the two squad cars that the council approved for purchase, but didn't fund equipping them.
  3. $21,000 for purchase of an unmarked police vehicle that the council had eliminated from the mayor's proposed capital budget. Passed 5-1 with alder Wiswell opposing.
  4. $39,000 as a loan to the CDA for the Renew Monona housing rehabilitation program. Referred to CDA and the city attorney.
Between the February 6th and 20th meetings, the end result was a $168,431 reduction iun city borrowing for the 2012 capital budget.

A couple further notes:


The bid opening for Monona Drive one February 14th and R.G. Huston was once again the low bidder at $3,341,382.92.  Foth’s engineer estimate was $3,254,767.88.  The $86,615 difference is 2.67%. Monona will only pay a portion of that $86,615 because the overall project is being funded 50% with federal funds and 50% local funds. The county, city of Madison and city of Monona are paying the local 50% share.

Bear in mind that the reduced spending for health insurance premiums (compared to 2011) will carry over to future budgets (minus premium increases). Specifically, the reduction in borrowing for 2012 capital projects is a one-time event. In other words, most of the $168,431 we used to reduce borrowing in 2012 will be available for the 2013 budget for whatever uses the mayor and council choose.

Finally, the remaining $39,000 hasn't been allocated yet. It may be that we can fund the renew Monona program from TID #6 payments. If so, then we could apply that $39,000 to further reduce borrowing or use it to amend the 2012 operating or capital budgets.



Saturday, November 19, 2011

Dredging Up the Past and Much, Much More

The Monona city council meeting on Monday, November 21 promises to be a test of endurance. Not only do we have the second reading of the 2012 operating budget with 18 amendments but we also have a first reading of the2012 capital budget. And just because we all loooove talking about dredging at Belle Isle, we will be revisiting that topic; it's always a popular item and usually brings out the islanders in force (pro and con).

The major topic of debate on the operating budget is whether to cut the Monona police department staffing by one uniformed officer as Mayor Miller has proposed - or not as Alders Speight, Wiswell, and I have proposed. Chief Ostrenga provided some interesting data on crime stats and staffing (officers/1000 population). Kudos to Alder Busse for digging up the same (or very similar) data on his own. Wally put together a very useful summary memo that is in our paper packets, but not online (I think).

Profiles of some of the MOPD staff can be found here. The officer whose job is on the line is Officer Jared Wedig, a smart, motivated young guy in whom we have invested a lot of money and time. I can't see cutting an officer when we can afford to fund the position.

By the way, the budget still incorrectly states that the amendment I am co-sponsoring would be funded entirely from the fund balance. My original email said I wanted to use the small amount of room under the levy cap (around $50,000) first and then use the reserve fund. I restated that at the first reading, but it hasn't been changed. Reinstating the position would cost about $77K.

About the working capital reserve fund or fund balance. Back in 2003 when Robb Kahl took office, the reserve fund had shrunk to about 7%. The bond rating folks lacked gruntlement. They weren't happy peas in a pod. It looked like a listing fiscal ship. With Robb's leadership, the council adopted a policy of keeping the reserve fund between 15% to 20%. That policy was fundamental in the city's attaining a strong fiscal condition and thus, an extremely strong bond rating. I supported that policy and still do.

At the end of 2011, the city will have $977,069 or a reserve percentage of 20.71%.  If we keep the fund balance at 17.5% (smack dab in the mid-range of our policy), we will have $831,934. Thus, we have $145,135 available to apply to the city's operating budget. I would argue that is fiscally prudent and fair to taxpayers to return that $145,135 to the city's residents either in services or lower taxes.




See the box at the bottom of page 1 of the revised executive summary of the operating budget .




I plan to propose that we apply both money from the fund balance and money from the property tax cap room to each and every amendment. More specifically, I plan to propose that we pro-rate the use of levy cap room and fund balance so that we apply the same proportion of property taxes and fund balance to each amendment. The proposed amendments total $130K. Assume we have $50K in levy cap room. We would apply 38.46% (50/130) from the property tax levy and 61.54% (80/130) from the reserve fund. That way the amendments are all on the same fiscal ground and rise or fall or on their own merits.

Out for now...

Wednesday, September 07, 2011

Dredging Delayed, Housing Approved

Last night, the Monona City Council rejected the bids for the Belle Isle dredging project. The rejections does not mean that the project has lost support of the council, but rather that a majority decided to wait until 2012. Alder Speight and I voted to go forward with the project in 2011.

While the dredging project has widespread, possibly unanimous support on the council, it became clear to me that the project could unravel. The project includes three channels. Several residents on Lagoon du Sud want that channel removed from the project. Some residents on Sumac Lagoon have expressed the same sentiment. If one or two channels are removed, contractors will likely lose interest in bidding and will bid at higher unit rates.

The council approved the GDP for the 215 Femrite row housing project is on for a decision.

***

You can expect to hear in the very near future about a resolution to the M.Y. Dream Park shelter lawsuit filed by the city against the architect.

***

Wiseguy moment. During a roll call vote, as he is wont to do Alder Wiswell cast "a reluctant aye". Adding a descriptive term seemed like such a good idea, I couldn't help but cast "a regular aye". I was followed by Alder Kugle who cast an "enthusiastic aye."

Friday, September 02, 2011

Monona City Council Preview - September 6, 2011

The Monona City Council will consider a number of important items next Tuesday, September 6. The GDP for the 215 Femrite row housing project is on for a decision. The project seems to have wide, but not unanimous support on the council.

Also up is a decision whether to accept the bids for the Belle Isle dredging project. The dredging project has widespread, possibly unanimous support on the council. The key question is whether to proceed in 2011 or re-bid it in early 2012. I'm undecided on the timing. We have received a lot of citizen input. Many of the comments center around various ways to calculate the special assessment.(See separate post for FAQs.)

On for a first read is the rejection of the bid for the Firemen's Park restroom/concession/storage building and instead combining replacement of the existing restrooms with a new open air shelter.

 So, nothing really controversial or anything...



Dredging FAQs

Begins on page 33 of the Belle Isle Dredging info.

Copied text from a memo from BT Squared to the City:

August 30, 2011
File No. 25211430.00
MEMORANDUM
TO:
City of Monona
F ROM: SCS BT Squared Project Team
S U B J E C T : Dredging Project – FAQ’s

Hydraulic Dredging vs Mechanical Dredging
The dredging process specified in the plans and specifications will be hydraulic dredging, and
not mechanical dredging. Hydraulic dredging will be something like taking a large “shop vac” in
the lagoon on a barge and pumping the muck along with some water from the bottom of the
channel to a dewatering location at Fireman’s Park.

Park Fill Material
Oneida Park is taking the roadway subgrade cut material (~11,000 cubic yards of material). The
plans for Oneida Park provided by the City of Monona Park and Recreation department with the
feedback from the residents does not allow for placement of the lagoon dredge material.
Park Restoration in Fireman’s Park
Park grading and restoration for Oneida park will not be part of the assessments provided to the
residents for the road project. The dredged material will be pumped to location in Fireman’s
Park that would need minimal site preparation to store the dredged material. No matter where
the dredge material ends up, the site would need to be prepared to accept the material and then
shaped and restored after dewatering. The Fireman’s Park was close to the channels for easy
return of the pumped water, and the site naturally was low and could accept fill without trucking
costs or additional grading that other sites might require.
What grants might be available?
The City applied for a Recreational Boating Fund (RBF) grant through the Wisconsin
Department of Natural Resources. The project scored low and did not receive a grant. To score
high for an RBF grant, dredging projects have to be for navigational channels that benefit the
public (e.g., provide access to a boat launch or connect two waterways). This is up to 50% cost
share, but more often in the 40 – 45% range. Grant applications must be submitted by June 1,
with awards likely sometime in August.
The Sport Fishing Grant uses the same application form as the RBF grant. This is a 50% cost
share. Applications are due February 15, but grants are not awarded/funded until August
because it is a federally funded grant.

There may be other local public or private funding sources, including Madison Fishing Expo
Group Funds and various Dane County funds. Many grants have similar requirements in terms
of demonstrating a public benefit from the project.
If we wait to dredge until 2012, will we need to reapply for permits?
The following permits have been obtained and are valid through the date listed.
• Chapter 30 permit – December 31, 2013
• Construction Site Erosion Control Permit – July 11, 2014
• WPDES Carriage Water Return Permit – July 2012, but can be extended as long as
project scope does not change
We are still awaiting approval/renewal of the Army Corps of Engineers permit; however, the
previous permit was valid for 4 years.
 
Pier/Lift Removal
The plans noted that piers would be removed prior to dredging. This note was based on
discussions with dredging contractors who confirmed that the best bid prices and removal of
material would come if the piers were removed. Pier removal letters were sent out as an early
notification to residents. After the bids were received and based on the feedback from the
residents, both contractors were asked if they could remove sediment with piers left in. Both
said “yes” but that they would not be responsible for any damage to any piers due to their
operations and removal of the project sediment. Landowners leaving piers in will need to sign
an indemnification form issued by the City allowing the contractor to perform dredging
operations around their pier and/or lifts and will not hold the contractor, City of Monona, SCS
BT Square, or any other entity working on the project responsible for any damage.
Plan Cross Section
s
The plans show cross section of the channel. The cross sections were based from a topographic
survey completed in June 2011. The cross sections show the amount of material that is proposed
to be removed at each location. The top of silt was the top of the muck as it existing in June.
The bottom of silt was the depth to which we could push the survey level rod down into the
muck in order to get to what we are calling the “hard bottom.”

Berms or Ground Giving Away
The purpose of the project is to remove the silt/muck from the lagoons. We are not proposing to
remove the actual hard bottom which forms the shape of the lagoon. The existing sideslopes are
3:1 sideslopes (3 foot horizontal to 1 foot down vertically) which are gradual enough to maintain
the banks.

Contractor Bidding
Bids were taken for the dredging project on August 3, 2011. The plan holders list was comprised
of 14 dredging companies and subcontractor / suppliers. There were 2 bids submitted: Gro America and PCI (Petersen Companies). The bids comprised of a base bid (dredge depth is ~ 5
feet, water surface at 845 and muck removal to 840), and an alternate bid to remove of all the
muck down to the harder lagoon depth.

Company Base Bid Alternate Bid Total Bid
GroAmerica $389,000 $67,151 $465,151
PCI $413,375 $61,325 $474,700

2012 Rebid
The option to rebid the project in 2012 has risk in that no one knows how many bids Monona
may get and prices could increase. Generally bidding in the early part of the year generates more
interest from contractors as they are trying to solidify project work for the year, but this does not
guarantee a project cost.

Special Assessment FAQs

Go to page 33 of the Belle Isle Dredging Info for the FAQ section.

Q1. WHEN WILL THE BELLE ISLE 2011 STREETS SPECIAL ASSESSMENT APPEAR ON MY TAX BILL?
A1. The Belle Isle 2011 Streets Special Assessment will be included on your 2013 tax bill (mailed in December, 2012). In order for a special assessment to be included on your 2012 tax bill (mailed in December 2011), the City must send an invoice to residents by September 30, 2011. In order for this happen, the project must be completed and the City must have a final invoice from the contractor before September 30, 2011. Because this is not scheduled to happen on this timeline, the street special assessment will not be included on your 2012 tax bill.

Q2. ARE SPECIAL ASSESSMENTS TAX DEDUCTIBLE?
A2. Per the Internal Revenue Service, special assessments are not tax deductible.

Q3. WHEN WILL THE DREDGING SPECIAL ASSESSMENT APPEAR ON MY TAX BILL?
A3: If all of the phases of the project are completed by September 30, 2012 and the City receives the final bill from the contractor by September 30, 2012, then the dredging assessment will be included on your 2013 tax bill (mailed in December of 2012). If either of the two is not completed by September 30, then the special assessment will be included on your 2014 tax bill (mailed in December of 2013). If the dredging project is started in 2011, the special assessment will most likely appear on your 2013 tax bill (mailed in December 2012).

Q4. WHAT ARE MY OPTIONS TO PAY TO SPECIAL ASSESSMENTS?
A4: There are three options. Example assumes using an 8-year payback period:
Option 1: You may elect to pay the total amount of your assessment on or before October 31. By paying the full amount, you will avoid paying interest on the special assessment.
Option 2: You may elect to pay a portion of the total special assessment on or before October 31 in order to reduce the amount of the special assessment installment placed on the tax roll (tax bills that are sent out in December). The remaining balance will be amortized over 8 years.
Option 3: If you elect not to pay any amount of the special assessment by October 31, one-eighth (1/8) of the assessment total will be placed on your tax bill, plus two (2) months accumulated interest. The
remaining installments will be placed on future tax rolls at an interest rate of ???%. You are allowed
to make a partial or full payment at any time during the course of the eight (8) year repayment
period. Again, interest will only accrue beginning November 1.

Q5. HOW IS THE INTEREST RATE DETERMINED?
A5: The City charges residents an interest rate that is 1 percent more than the interest rate the City received when it borrowed the money. The City’s financial advisor estimates an interest rate of 2.5-3.0%.

Monday, August 29, 2011

The Ayes Have It



The Belle Isle Neighborhood Association took a vote by email on the lagoon dredging project. Four votes were also cast by handwritten notes. The emails (and notes) are ‘yes’ or ‘no’ votes on dredging and also on whether to dredge in 2011 or 2012. 

55 responses.
45 yes
9 no.

24 for 2011
27 for 2012
4 never

(A few of the no’s also said 2012, if the dredging happens.)

Saturday, August 27, 2011

Dredging Up History

The planned dredging project at Belle Isle is a major issue on the council's plate right now. I strongly believe the dredging will go forward either this fall or next year. It has been planned for a number of years, but a key difference that demonstrates the city's commitment to the project is that the city hired an engineering firm to prepare for the project. The lagoons have not been dredged since the early 1950's.

Under current ordinances, benefited property owners will pay 70% of the costs. Residents of that area also got hit with street special assessments this year, but the projects have both been in the works for years and it was known that both would likely take place in the same year or continuous years. (I note that when a road is first improved with concrete curb and gutter, abutting property owners pay 60% of the cost for the road work. The city taxpayers pay the other 40%. City ratepayers pay all of the costs for utility work.

Belle Isle residents are understandably upset that bids came in triple the amount of then-city engineer Rich Vela's estimate from a couple years ago. That cost jump is one reason we are considering re-bidding the project.